Most Engineered and Budget Friendly Zipline built by Oxo in Nepal
What started as a single zipline has not been converted into a pair of ziplines. These are budget friendly ziplines built with expert engineering and least possible intervention in the natural terrain of Chisapani. The total Steel used in putting 2 100 meters zipline is less then 1.5 Tonnes. There is some chemical anchoring done for anchoring the steel section members.
Recent Comments